Brief
Capture the size and scale of TCP's R80m infrastructural investments including upgraded and new railways, ports, pipelines etc. in just six minutes.
Solution
- A modular production, which meant each Transnet division could have its own corporate video as well
- Beautifully-shot aerial and ground-based images
- A sweeping script
- A rousing musical score
Result
Client was awed by the power of the production.